Image not found
uploads/location_image_1785386857874.jpg
Prodip Kumar Roy
W02
Orientation on " Each Awarded Package (W-02
30 Jul 2026 10:49 AM
22.15612700, 90.12609850
Image not found
uploads/location_image_1785393833788.jpg
Prodip Kumar Roy
W02
W02, W03 Orientation Meeting
30 Jul 2026 12:44 PM
22.15611470, 90.12615650
Image not found
uploads/location_image_1786335658964.jpg
Tonmoy Ahmed, SE, Satkhira
W05
Training on Introductory ESHS
10 Aug 2026 10:21 AM
22.72616130, 89.06599940
Image not found
uploads/location_image_1786337457192.jpg
Environmental, Social, Health and Safety (ESHS). Meeting
10 Aug 2026 10:51 AM
22.72616100, 89.06599560
Image not found
uploads/20260821103129_b04dd39907f01459.jpg
Bayazid Mollah, SE, Asashuni
W05
Soil conformity test is going on.
21 Aug 2026 10:31 AM
22.38435870, 89.19713890
Image not found
uploads/location_image_1787719472088.jpg
Md.Abdus Salam, AE, Bhola
W01
Temporary Structures under progress
26 Aug 2026 10:44 AM
22.19032140, 90.81054100
Image not found
uploads/20260826114921_60daaeb400da2606.jpg
survey work
26 Aug 2026 11:49 AM
22.19039260, 90.81147020
Image not found
uploads/20260826150309_d6d5b63f93d59866.jpg
Prodip Kumar Roy
W02
1 no(67) pile casting work on going present with ARE, Site Engineer, Jr. Engr., Contructor representatives.
26 Aug 2026 03:03 PM
22.09647370, 90.06941820
Image not found
uploads/20260827130425_84323699591895be.jpg
Prodip Kumar Roy
W02
2 Nos pile work is on going out of 76 nos pile.
27 Aug 2026 01:04 PM
22.09663140, 90.06983230
Image not found
uploads/20260829114043_f5b1541f717565dd.jpg
4 Nos Pile Work is on Goning out of 76 nos
29 Aug 2026 11:40 AM
22.09646910, 90.06945390
Image not found
uploads/20260830100438_4f61fef1b1322311.jpg
Prodip Kumar Roy
W02
10 no pile work is continued at Baistabak GPS.
30 Aug 2026 10:04 AM
22.20006680, 90.13539710
Image not found
uploads/20260830101452_ce0d9c3e7c0ffd82.jpg
DR,Nurul Islam, Environment, Social Specialsit
Pile works are ongoing
30 Aug 2026 10:14 AM
22.20000290, 90.13551060
Image not found
uploads/20260830101859_3a71b75e1686f48d.jpg
DR,Nurul Islam, Environment, Social Specialsit
Sign board is placed in the worksite
30 Aug 2026 10:18 AM
22.20011960, 90.13536780
Image not found
uploads/20260830105711_9a41cd2e7e5ee7f2.jpg
Prodip Kumar Roy
W02
workshop on Orientation for each award work present with TM, RE, ESHS, DRE, ARE, Site engineer, J.E and contructor representatives.
30 Aug 2026 10:57 AM
22.19997680, 90.13535010
Image not found
uploads/20260830165216_3017d6df8472590b.jpg
Prodip Kumar Roy
W02
Capacity Building workshop on ESHS
30 Aug 2026 04:52 PM
22.09672760, 90.07001310
Image not found
uploads/location_image_1788158922420.jpg
Md.Muraduddoula, DRE, Bhola and Barguna
W01,W02 and W03
Workshop Training on ESHS
31 Aug 2026 12:48 PM
22.16469050, 90.03597540
Image not found
uploads/20260913132428_27b5d25f4f6ef4b6.jpg
Amanullah Aman, JE, Barguna
W02 New10, Rehab-03
Reinforcement cage is checked by J.E,S.E
13 Sep 2026 01:24 PM
22.20000180, 90.13533570
Image not found
uploads/20260916165641_78978ff3966b0ed7.jpg
Tonmoy Ahmed, SE, Satkhira
W05
Land issue discussion.
16 Sep 2026 04:56 PM
22.36199600, 88.99300390
Image not found
uploads/20260917120117_df82a1ca8dc45c3f.jpg
Amanullah Aman, JE, Barguna
W02 New10, Rehab-03
Cylinder curing tank.
17 Sep 2026 12:01 PM
22.20013850, 90.13537100
Image not found
uploads/20260921154523_72bfafe2a5e8c3bf.jpg
Prodip Kumar Roy
W02
Testing in progress
21 Sep 2026 03:45 PM
22.09665230, 90.06981180
Image not found
uploads/20260922100200_eb3e0bef8b976198.jpg
Prodip Kumar Roy
W02
Labour shed work is ongoing at Burichor gps
22 Sep 2026 10:02 AM
22.13346920, 90.20378840
Image not found
uploads/20260923101838_52b09b880a419299.jpg
Md.Hadiuzzaman,JE, Barguna
W03,
Pilling work going on
23 Sep 2026 10:18 AM
22.19990170, 90.13530340
Image not found
uploads/20260923102933_218af74e46e6830b.jpg
Prodip Kumar Roy
W02
Slump check and cylinder making is ongoing present with RE, DRE, ARE, ME and Contractors representatives.
23 Sep 2026 10:29 AM
22.19989780, 90.13530260
Image not found
uploads/20260923103148_176990f694ae1b0b.jpg
Amanullah Aman, JE, Barguna
W02 New10, Rehab-03
For 45 Nos pile casting cylinder and slump checking by RE,DRE,ARE,S.E,J.E and Contractor Rep.
23 Sep 2026 10:31 AM
22.19988270, 90.13529860
Image not found
uploads/20260923103614_ed9cbae49ccb8d84.jpg
Md.Hadiuzzaman,JE, Barguna
W03,
45 nos.Pilling working slump checking
23 Sep 2026 10:36 AM
22.19989550, 90.13530440
Image not found
uploads/20260924105921_62e092bcc3a9d4fd.jpg
Rakat Ali, JE, Barguna
W03 Rehab 19
11 Nos pile Casting going on at Horidra GPS
24 Sep 2026 10:59 AM
22.16425390, 90.03590130
Image not found
uploads/20260924140844_5afe2d371004598a.jpg
46 Nos pile Boring Work ongoing Out of 76 Nos Nimtali GPS
24 Sep 2026 02:08 PM
22.09657270, 90.06943840
Image not found
uploads/20260924155626_97e8db903987bc20.jpg
Md.Abdus Salam, AE, Bhola
W01
ESHS capacity programe
24 Sep 2026 03:56 PM
22.18891280, 90.76034570
Image not found
uploads/20260924155703_72d2d8b0c8d177d1.jpg
Md.Abdus Salam, AE, Bhola
W01
Alternative temporary wash block
24 Sep 2026 03:57 PM
22.19031880, 90.81052070
Image not found
uploads/20260924160237_73ebd41f7797ca75.jpg
Monirul Islam, SE, Bhola
W01
Temporary Site office
24 Sep 2026 04:02 PM
22.19028980, 90.81054560
Image not found
uploads/20260926103407_f1523d9a7f2e607a.jpg
Illias Hossain, JE, Satkhira
W04 New 12,44,48
building area marking. topo survey
26 Sep 2026 10:34 AM
22.27861600, 89.12541870
Image not found
uploads/20260926150654_262d4c97be916fcd.jpg
Prodip Kumar Roy
W02
48 nos pile work is ongoing at Baistabak GPS out of 80 nos
26 Sep 2026 03:06 PM
22.19998850, 90.13538660
Image not found
uploads/20260927084620_fca9c2eae6f0244f.jpg
Amanullah Aman, JE, Barguna
W02 New10, Rehab-03
49 Nos pile casting ongoing at baistabok site in Barguna Sadar
27 Sep 2026 08:46 AM
22.19993740, 90.13531310
Image not found
uploads/20260928084649_80deea9532b68623.jpg
Amanullah Aman, JE, Barguna
W02 New10, Rehab-03
51 Nos pile casting ongoing at baistabok site in Barguna Sadar
28 Sep 2026 08:46 AM
22.19984810, 90.13527160
Image not found
uploads/20260929090935_88e3b67b9edef2e5.jpg
Amanullah Aman, JE, Barguna
W02 New10, Rehab-03
53 Nos(Out of 80) pile casting ongoing at baistabok site in Barguna Sadar
29 Sep 2026 09:09 AM
22.19984840, 90.13528420
Image not found
uploads/20260929101603_ca58f33a8222a13e.jpg
Main Uddin, JE, Satkhira
W04 New 18,46,47
133 No. soto vetkhali school building layout work
29 Sep 2026 10:16 AM
22.21526650, 89.13581030
Image not found
uploads/20260929103903_9ba47d8e8cc113b1.jpg
Tonmoy Ahmed, SE, Satkhira
W05
Sat New 03
Land and Electric Pole Issue
29 Sep 2026 10:39 AM
22.38641800, 89.08534320
Image not found
uploads/20260929104755_446169af3235088f.jpg
Rakat Ali, JE, Barguna
W03 Rehab 19
15 Nos pile Casting going on at Horidra GPS
29 Sep 2026 10:47 AM
22.16429260, 90.03585410
Image not found
uploads/20260929163951_d0ba7315561dc58c.jpg
Main Uddin, JE, Satkhira
W04 New 18,46,47
137 No. Munshiganj dokkhin para School building layout
29 Sep 2026 04:39 PM
22.23767910, 89.14965260
Image not found
uploads/20260930112746_6eac83ea630c1050.jpg
Rakat Ali, JE, Barguna
W03 Rehab 19
16 Nos pile Casting going on at Horidra GPS
30 Sep 2026 11:27 AM
22.16431980, 90.03591750
Image not found
uploads/20260930123733_f6a59b12a9a046a4.jpg
Moniruzzaman, JE, Shaymnagar
W04, New 10,26,49
Orientation on Implementation of Awarded packages under CRIM Project
30 Sep 2026 12:37 PM
22.72615420, 89.06600250
Image not found
uploads/20260930131833_29ae2304f6cde945.jpg
Tousik Hassan, JE, Sathira
W05
Orientation on Implementation of Awarded packages under CRIM Project.
30 Sep 2026 01:18 PM
22.72615550, 89.06599580
Image not found
uploads/20260930132950_705bb31be7e8fdab.jpg
56 nos pile Boring work is on going Out of 76 nos Nimtali GPS
30 Sep 2026 01:29 PM
22.09655690, 90.06942840
Image not found
uploads/20261013130048_d4193d7866bc2c59.jpg
Prodip Kumar Roy
W02
First Aid kit Box
13 Oct 2026 01:00 PM
22.19988520, 90.13530430
Image not found
uploads/20261017112144_49f6daaf1168fa61.jpg
Rakat Ali, JE, Barguna
W03 Rehab 19
32 Nos pile Concrete cylinder sample,
present DRE sir,ARE sir,JE
17 Oct 2026 11:21 AM
22.16440650, 90.03596200
Image not found
uploads/20261028101802_22155fb8b277efb3.jpg
Md.Zahirul Islam, AE, Barguna
W03
CC Camera installation team visited for fixing the pole point.
28 Oct 2026 10:18 AM
22.00580730, 90.00400110
Image not found
uploads/20261029093233_018c969f164d3b0d.jpg
Rakat Ali, JE, Barguna
W03 Rehab 19
Tools Box Meeting at Horidra GPS
29 Oct 2026 09:32 AM
22.16444620, 90.03590430
Image not found
uploads/20261029110445_478287ae3a67ffd3.jpg
Amreto Kumar Sarker, JE, Barguna
WO2/Rehab 14
Temporary School Shed complete
29 Oct 2026 11:04 AM
22.10097380, 90.20761510
Image not found
uploads/20261029120727_c2aa7fce4c1db959.jpg
Amanullah Aman, JE, Barguna
W02 New10, Rehab-03
Road survey ongoing at baistabok site in Barguna sadar
29 Oct 2026 12:07 PM
22.19999750, 90.13535980
Image not found
uploads/20261030112825_071490bbc1411926.jpg
Redowan Hossain, JE, Bhola
W01 New-03/21
Present status of Temporary labor shed and site office.
30 Oct 2026 11:28 AM
22.19052930, 90.81079570
Image not found
uploads/20261030113053_40f0d4d5496e7c93.jpg
Monirul Islam, SE, Bhola
W01
Site development work visit .
30 Oct 2026 11:30 AM
22.19035390, 90.81053040
Image not found
uploads/20261030114059_da3e323227b6a91e.jpg
Monirul Islam, SE, Bhola
W01
Site development work visit
30 Oct 2026 11:40 AM
22.19032440, 90.81058490
Image not found
uploads/20261101094157_b0ac4456cef35b6b.jpg
Md.Muraduddoula, DRE, Bhola and Barguna
W01,W02 and W03
Site inspection Bar_ Reh_19 with ARE, JE and Contractors Rep. piling works #49, sequence 55, PC#06
01 Nov 2026 09:41 AM
22.16431020, 90.03577470
Image not found
uploads/20261101101925_66052c0001e9bef9.jpg
Nazmul Hassan, JE, Barguna
W03 New 21
Rebar banding chaking.
01 Nov 2026 10:19 AM
22.16474900, 90.03596710
Image not found
uploads/20261101105543_e5748d8fcd044809.jpg
Md.Zahirul Islam, AE, Barguna
W03
49 nos pile casting concrete slump test at horidra gps
01 Nov 2026 10:55 AM
22.16442450, 90.03578790
Image not found
uploads/20261101105603_f3cc3de6d3fac6e6.jpg
Rakat Ali, JE, Barguna
W03 Rehab 19
49 Nos Pile Casting concrete slump test check at Horidra GPS
01 Nov 2026 10:56 AM
22.16483210, 90.03579940
Image not found
uploads/20261101143205_924888fb1773535c.jpg
Abul Hassan, JE, Bhola
W01 W06
Layout work for the temporary school shed is ongoing.
01 Nov 2026 02:32 PM
22.19142940, 90.71205640
Image not found
uploads/20261101143209_f94135158daee682.jpg
Abul Hassan, JE, Bhola
W01 W06
Layout work for the temporary school shed is ongoing.
01 Nov 2026 02:32 PM
22.19115510, 90.71230510
Image not found
uploads/20261102105600_193bc1e049074576.jpg
Ayub Ali, JE, Satkhira
Excavations work for ventonite and Cc cemera placing work in progress at 107 No Nabinagar GPS.
02 Nov 2026 10:56 AM
22.46141830, 89.12671670
Image not found
uploads/20261102112027_5757b6c3d7e213fb.jpg
Md.Shariful Islam, AE, Satkhira
W05
Pre construction activities
02 Nov 2026 11:20 AM
22.46141180, 89.12672120
Image not found
uploads/20261102114530_a80da6fa769844af.jpg
Md.Shariful Islam, AE, Satkhira
W05
CC Camera location selection
02 Nov 2026 11:45 AM
22.46141900, 89.12673100
Image not found
uploads/20261102115204_9852b65844d76c22.jpg
Amreto Kumar Sarker, JE, Barguna
WO2/Rehab 14
Temporary School Structure
02 Nov 2026 11:52 AM
22.13189280, 90.21230340
Image not found
uploads/20261102115549_32d9b726d6ac570b.jpg
Md.Shariful Islam, AE, Satkhira
W05
Remote Monitoring Camera location
02 Nov 2026 11:55 AM
22.46141150, 89.12672470
Image not found
uploads/20261102120021_375dd459f0ea6341.jpg
Md.Shariful Islam, AE, Satkhira
W05
CC camera location
02 Nov 2026 12:00 PM
22.46141750, 89.12671600
Image not found
uploads/20261102120248_b7e33ad5295d6811.jpg
Ayub Ali, JE, Satkhira
today site inspection of Consultant team RE, ARE, SE with Contractor Representive at Nabinagar GPS.
02 Nov 2026 12:02 PM
22.46141240, 89.12672400
Image not found
uploads/20261102120951_6690a327af41c02c.jpg
Tonmoy Ahmed, SE, Satkhira
W05
Temporary structures
02 Nov 2026 12:09 PM
22.46140850, 89.12673100
Image not found
uploads/20261102121210_a10ff63ec6db73b3.jpg
Tonmoy Ahmed, SE, Satkhira
W05
Layout in Progress
02 Nov 2026 12:12 PM
22.46140950, 89.12673070
Image not found
uploads/20261102124506_67c4cc0dc6599068.jpg
Kudratee Jahan, JE, Bhola
W01 New 02 & 04
Demolition work of existing building complete
02 Nov 2026 12:45 PM
22.15675800, 90.80325920
Image not found
uploads/20261102140807_c47d978bdeb8a048.jpg
Nishat Haider, JE, Barguna
W02/New-19
Present status of Temporary labor shed and site office.
02 Nov 2026 02:08 PM
22.00628820, 90.16572300
Image not found
uploads/20261102143427_3d0fc2c67f5478af.jpg
Nishat Haider, JE, Barguna
W02/New-19
Present status of Temporary labor shed and site office.
02 Nov 2026 02:34 PM
22.02990500, 90.15700170
Image not found
uploads/20261103111230_ca003f0654a9660f.jpg
Site Visit Temporary school class Start
03 Nov 2026 11:12 AM
22.00634670, 90.16615330
Image not found
uploads/20261103111347_173611ecae03879b.jpg
Jahirul Islam, SE, Barguna
W03, Tatltali
Sand is stockpiled on site. Classes for students have started in the temporary school building, and the old building has not been demolished yet
03 Nov 2026 11:13 AM
22.00635240, 90.16595840
Image not found
uploads/20261103115151_6a6062dfea5d57c4.jpg
SK Walid Ibne Hasan, SE, Tala
W05
eng site office. today work stopped
03 Nov 2026 11:51 AM
22.65259860, 89.19245450